ELECTRIC NETWORK TO MATURE
SURABAYA, 21/2 - THE NETWORK OF MADURA. A number of workers, conducting electrical material installation in the stem tower of the Extra High Voltage Air Line (SUTET) for electrical distribution to Madura Island, near Suramadu Bridge Surabaya, Sunday (21/2). All subsea electrical cable replacement connections from Java Island to Madura have moved down the Suramadu bridge body to Madura, and it is estimated that all workmanships will be finished late in February. ANTARA/Bhakti Pundhowo/ed/nz/10
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.