RAIL ALIGNMENT CLOSURE

  • 12th May 2019 WIB
RAIL ALIGNMENT CLOSURE
Electric railroads cross the Cakung railway track, in East Jakarta, Sunday (12/5/2019). PT Kereta Api Indonesia (KAI) and DKI Jakarta Transportation Office closes two railway crossings in the Cakung Station and Cipinang Lama to smooth the operation of double-double track railway crossing (DDT). ANTARA PHOTO/Risky Andrianto/ama.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Tags:
Image information
Image size
4000x2611
File size
1.89 MB
Created
12/05/2019 18:40 WIB
Photographer
Risky Andrianto
Editor
Audy Mirza Alwi