PREPARATION OF WIDE TRANSPORT RAILWAY

  • 25th May 2019 GMT+7
PREPARATION OF WIDE TRANSPORT RAILWAY
Workers do the treatment of railway parts at Banyuwangi Station, Banyuwangi, East Java, Saturday (25/5/2019). PT KAI Daops 9 predicts the number of train users on the mudik flow in 2019 is estimated to increase about two percent compared to the last year. For that, Daops 9 has prepared eight medium and long distance KAs. ANTARA PHOTO/Budi Candra Setya/wsj.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
4000x2667
File size
1.95 MB
Created
25/05/2019 15:30 WIB
Photographer
Budi Candra Setya
Editor
Widodo S Jusuf