TRACK REVIEW

  • 29th May 2019 GMT+7
TRACK REVIEW
Menko PMK Puan Maharani, (second left) along the Minister of Health Nila Moeloek (left), Minister of Transportation Budi Karya Sumadi (the left three), Minister of PUPR Basuki Hadimuljono (the left) and Kapolda Jabar Irjen Pol Rudy Sufahriadi (second right) listening to the explanation of the related officers of the traffic current engineering when reviewing the readiness of the south lane width in Simpang Nagreg Cikaledong, Bandung Regency, West Java, Wednesday (29/5/2019). Based on the data of the Ministry of PUPR, the south traffic path that has a length of 888 kilometers has been prepared by 98 percent as well as the South Java coastline has been connected 1.267 kilometers from a total of 1.647 kilometers or has been prepared 83 percent. ANTARA PHOTO/Raisan Al Farisi/foc.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
4000x2649
File size
1.84 MB
Created
29/05/2019 10:50 WIB
Photographer
Raisan Al Farisi
Editor
Fanny Octavianus