TRAFFIC ENGINEERING ON MUDIK LINE
The Office Officer In connection to install traffic signs when conducting engineering and then-lined at Kranggan mitigation, Temanggung, Saturday Central Java (1/6/2019). In order to avoid congestion in the meeting location of Semarang-Wonosobo-Magelang direction when the mud and backflow of the officer conducts traffic engineering. PHOTO ANTARA/Anis Efizudin/foc.
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.