RAILWAY REPAIR

  • 1st June 2019 WIB
RAILWAY REPAIR
Worker conducts the repair of railroads on the Tulungagung KA lines above the 593 bridge number 162+4/5, Ngantru, Tulungagung, East Java, Saturday (1/6/2019). The repair is carried out after the path checker officers found a number of rail bolts on the kendordor wood bearing so that it must be reset or normalized by smoothness and safety during the mud flow and back Width 1440 H. ANTARA PHOTO/Destyan Sujarwoko/ama.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
4000x6027
File size
2.45 MB
Created
01/06/2019 16:45 WIB
Photographer
Destyan Sujarwoko
Editor
Audy Mirza Alwi