CAMPUS BUILDING HEIN AMBON STRANDED GROUND MOVING

  • 9th June 2019 WIB
CAMPUS BUILDING HEIN AMBON STRANDED GROUND MOVING
The review team of the National Agency of Disaster Management (BNPB) reviewed the Auditorium Building of the State Islamic Religion Institute (IAIN) A broken Ambon due to the movement of land in the campus area of IAIN, the Red Stone Village, Ambon, Maluku, Sunday (9/6/2019). The movement of land happened since Monday (3/6/2019) was originally damaging the library Center building and threatened a number of other buildings, Auditorium building, MIPA Laboratory building and generator building in the location. ANTARA PHOTO/izaac mulyawan/ama.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
4000x2667
File size
1.68 MB
Created
09/06/2019 18:25 WIB
Photographer
Izaac Mulyawan
Editor
Audy Mirza Alwi