CAMPUS BUILDING HEIN AMBON STRANDED GROUND MOVING

  • 9th June 2019 GMT+7
CAMPUS BUILDING HEIN AMBON STRANDED GROUND MOVING
The review team of the National Agency of Disaster Management (BNPB) reviewed the Auditorium Building of the State Islamic Religion Institute (IAIN) A broken Ambon due to the movement of land in the campus area of IAIN, the Red Stone Village, Ambon, Maluku, Sunday (9/6/2019). The movement of land happened since Monday (3/6/2019) was originally damaging the library Center building and threatened a number of other buildings, Auditorium building, MIPA Laboratory building and generator building in the location. ANTARA PHOTO/izaac mulyawan/ama.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
4000x2667
File size
1.68 MB
Created
09/06/2019 18:25 WIB
Photographer
Izaac Mulyawan
Editor
Audy Mirza Alwi