POST WIDTH ELECTRICITY PEAK LOAD

  • 15th June 2019 WIB
POST WIDTH ELECTRICITY PEAK LOAD
Workers install electrical installations in the Extra High Voltage Air Line tower (SUTET) in the Porong arteries, Sidoarjo, East Java, Saturday (15/6/2019). The peak load of the electricity of the Java-Bali system during the width of 2019 has a decrease of 62 percent or about 10.637 MW under the average normal condition of 27.000 MW with the power supply capability capable of 34.716 MW. ANTARA PHOTO/Umarul Faruq/pras.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
4000x2667
File size
2.87 MB
Created
15/06/2019 17:20 WIB
Photographer
Umarul Faruq
Editor
Prasetyo Utomo