POST WIDTH ELECTRICITY PEAK LOAD

  • 15th June 2019 GMT+7
POST WIDTH ELECTRICITY PEAK LOAD
Workers install electrical installations in the Extra High Voltage Air Line tower (SUTET) in the Porong arteries, Sidoarjo, East Java, Saturday (15/6/2019). The peak load of the electricity of the Java-Bali system during the width of 2019 has a decrease of 62 percent or about 10.637 MW under the average normal condition of 27.000 MW with the power supply capability capable of 34.716 MW. ANTARA PHOTO/Umarul Faruq/pras.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
4000x2667
File size
2.87 MB
Created
15/06/2019 17:20 WIB
Photographer
Umarul Faruq
Editor
Prasetyo Utomo