SHIP DELAY ORDER PT INDO I

  • 19th July 2019 WIB
SHIP DELAY ORDER PT INDO I
Director of Engineering PT Pelabuhan Indonesia I (Persero) Hosadi Apriza Putra (left) along the President Director of PT Dok Pership Surabaya (DPS) Bambang Soendjaswono (second left) and President Director of PT Industri Ship Indonesia (IKI) Edy Widarto (left three) reviewed the manufacture of tunda (tugboat) laying Lunas Ship (Keel Laying) Tunda in PT Dok Per Shipping Surabaya (DPS), Surabaya, East Java, Friday (19/7/2019). PT Dok Perloran Surabaya (DPS) and PT Industri Kapal Indonesia (IKI) built two tunda ships (tug boat) which is the order of PT Pelabuhan Indonesia I. ANTARA PHOTO/Didik Suhartono/ama.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
4000x2667
File size
2.16 MB
Created
19/07/2019 18:25 WIB
Photographer
Didik Suhartono
Editor
Audy Mirza Alwi