ELECTRICAL CARE PRACTICES.

  • 30th July 2007 GMT+7
ELECTRICAL CARE PRACTICES.
DENPASAR, 30/7 - FACILITIES MAINTENANCE. Brazilian electrical consultant Ricardo Brauner installs a drop wire on a 20 thousand volt electric cable during a high-voltage electricity facilities maintenance demonstration without having to shut down the plant, in Denpasar, Bali, July 30, 2007. The high-risk maintenance process is performed to guarantee the electricity continuity in Bali, which recently suffer minor blackout. FOTO ANTARA/Nyoman Budhiana/Koz/hp/ox/07.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Tags:
Image information
Image size
994x1500
File size
101.67 KB
Created
30/07/2007 13:44 WIB
Photographer
Nyoman Budhiana
Editor