THE INAUGURATION OF ELECTRICITY INFRASTRUCTURE NTB NTT

  • 25th July 2019 GMT+7
THE INAUGURATION OF ELECTRICITY INFRASTRUCTURE NTB NTT
Minister of Energy and Mineral Resources (ESDM) Ignasius Jonan (second left) accompanied by Plt President Director PLN Djoko Rahardjo Abu Manan (center) and Governor NTB Zulkieflimansyah (right) reviewed Power Plant Gas Engine (PLTMG) inaugurated in Labuhan Badas District, Sumbawa Besar, Sumbawa District, NTB, Thursday (25/7/2019). Inaugurated electricity infrastructure including PLTMG Sumbawa 50 MW, PLTMG Bima 50 MW, PLTMG Maumere 40 MW as well as the electricity toll construction project 150 kilo Volt (kV) SumbawaƂBima along 461 kilometers circuit (kms).ANTARA FOTO/Ahmad Subaidi/aww.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
4338x2895
File size
3.53 MB
Created
25/07/2019 17:35 WIB
Photographer
Ahmad Subaidi
Editor
Andika Wahyu